Welcome to
PT Sapta Pusaka Listrik Nusantara

About SPLN

PT. Sapta Pusaka Listrik Nusantara was founded in 1991 to accommodate the needs of the Electrical projects. Among of them are luxurious and prestigious project in Indonesia.

All our product has met the IEC standard for worldwide usage and PUIL for Indonesian Standard. We are partnered with many breaker component and have recieved certifiaction as their panel builders.

SPLN is one of the oldest panel maker in Indonesian, but still standing as one of the best. We have improved our management for the better system, quality, and efficiency. To improve out quality we apply for other certification, TKDN, ISO 9001, ISO 14001, ISO 45001.

At Sapta Pusaka Listrik Nusantara, we pride ourselves on being innovators in the filed of Electrical Equipment Manufacturing. Our cutting-edge technologies help us lead the industry forward, and our meticulous work has earned us a reputation as a top manufacturer.


Process

Mechanical Process

Our unique and versatile modular system goes through the same process. First is the cutting and punching with CNC machine and then bending process. After the metal sheets was made, the process will go through finishing process and quality control before going to further process.

Painting Process

The painting process always undergo treatment before hand. This will keep the Switchboard from rusting and make sure the powder coating will glued perfectly on the metal sheet.

We sprayed the metal sheet with powder coating (color can be requested) then oven it to for perfection. We have tested our powder coating with sea salt test for 720 hours, bending and scratch test to deliver certainty for customers.

Assembling and Wiring

This process is what makes us different. Our modular system is easily assembled. And after the production drawing is final from engineering division, the wiring process done by skilled workmanship.

What We Have Achieved So Far

Years of Service

Projects Completed

Professional Team

Satisfied Partners

Product

  • Electrical Switchboard
  • Hydrant Box
  • Cable Management Systems
  • Air Distribution Systems
  • All

Portfolio

Stadion Gresik

PT. Sapta Pusaka Listrik Nusantara menerima pesanan dari PT. Mitra Perkasa Karunia untuk proyek Stadion Gresik. Lingkup pekerjaan mencakup manufaktur dan penyediaan panel dengan nilai kontrak sebesar Rp. 1.512.500.000,00

Lihat Detail

Sun City Apartment - Sidoarjo

PT. Sapta Pusaka Listrik Nusantara menerima pesanan dari PT. Ikanindo Rekatama Cipta untuk proyek Sun City Apartment - Sidoarjo. Lingkup pekerjaan mencakup manufaktur dan penyediaan panel dengan nilai kontrak sebesar Rp. 1.756.122.000,00

Lihat Detail

Blog

Perbedaan LVMDP dan LVSDP dalam Sistem Kelistrikan

Admin
/
Panel Listrik

Read More

Pengertian, Kegunaan, dan Manfaat Type Tested Panel

Admin
/
Panel Listrik

Read More

Capacitor Bank vs. Active Harmonic Filter: Mana yang Lebih Efektif untuk Instalasi Listrik?

Admin
/
Sistem Distribusi Tenaga Listrik

Read More